납기지연시간 단축을 위해 AGV 시간을 고려한 작업할당 방법

A AGV time-oriented Job Dispatching Methodology for Preventing the Tardiness

김근형(고려대학교); 고효헌(고려대학교); 백준걸(고려대학교)

13권 4호, 125~137쪽

초록

Customers are generally requiring a variety of products, earlier due date, and lower price. A manufacturing process needs the efficient scheduling to meet those customer's requirements. This study proposes the novel algorithm named MJA(Minimum Job completion time and AGV time) that increases the performance of machines and AGV(Automated Guided Vehicles) in many kinds of job types. MJA optimizes the bottleneck of machines and efficiency of AGV with considering two types of dispatching at the same time. Suggested algorithm was compared with existing heuristic methods by several simulations, it performed better for reducing the time of tardiness.

Abstract

Customers are generally requiring a variety of products, earlier due date, and lower price. A manufacturing process needs the efficient scheduling to meet those customer's requirements. This study proposes the novel algorithm named MJA(Minimum Job completion time and AGV time) that increases the performance of machines and AGV(Automated Guided Vehicles) in many kinds of job types. MJA optimizes the bottleneck of machines and efficiency of AGV with considering two types of dispatching at the same time. Suggested algorithm was compared with existing heuristic methods by several simulations, it performed better for reducing the time of tardiness.

발행기관:
대한안전경영과학회
분류:
안전공학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
납기지연시간 단축을 위해 AGV 시간을 고려한 작업할당 방법 | 대한안전경영과학회지 2011 | AskLaw | 애스크로 AI