BTL 민간투자사업을 위한 LCC분석 시스템 개발에 관한 연구
A Study on Development of Life Cycle Cost Analysis System for Build-Transfer-Lease Projects
이춘경(목원대학교); 이미혜(목원대학교); 조봉호(아주대학교); 최중현(우송대학교); 박태근(목원대학교)
24권 4호, 53~61쪽
초록
This study is finally aimed at developing analysis system of life cycle cost for BTL projects. In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high–quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.
Abstract
This study is finally aimed at developing analysis system of life cycle cost for BTL projects. In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high–quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.
- 발행기관:
- 대한건축학회
- 분류:
- 건축공학