애스크로AIPublic Preview
← 학술논문 검색
학술논문대한안전경영과학회지2009.09 발행KCI 피인용 2

부품 공급업자와 조립업자간의 공동 일정계획을 위한 모집단 관리 유전 해법

An Population Management Genetic algorithm on coordinated scheduling problem between suppliers and manufacture

양병학(경원대학교); Adedeji B.Badiru(Air Force Institute of Technology, USA)

11권 3호, 131~138쪽

초록

This paper considers a coordinated scheduling problem between multi-suppliers and an manufacture. When the supplier has insufficient inventory to meet the manufacture's order, the supplier may use the expedited production and the expedited transportation. In this case, we consider a scheduling problem to minimize the total cost of suppliers and manufacture. We suggest an population management genetic algorithm with local search and crossover (GALPC). By the computational experiments comparing with general genetic algorithm, the objective value of GALPC is reduced by 8% and the calculation time of GALPC is reduced by 70%.

Abstract

This paper considers a coordinated scheduling problem between multi-suppliers and an manufacture. When the supplier has insufficient inventory to meet the manufacture's order, the supplier may use the expedited production and the expedited transportation. In this case, we consider a scheduling problem to minimize the total cost of suppliers and manufacture. We suggest an population management genetic algorithm with local search and crossover (GALPC). By the computational experiments comparing with general genetic algorithm, the objective value of GALPC is reduced by 8% and the calculation time of GALPC is reduced by 70%.

발행기관:
대한안전경영과학회
분류:
안전공학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
부품 공급업자와 조립업자간의 공동 일정계획을 위한 모집단 관리 유전 해법 | 대한안전경영과학회지 2009 | AskLaw | 애스크로 AI