IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례

A study of actual planning how to increase IT productivity by COCOMOⅡ Model

박철구(명지대학교 산업경영공학과); 김창은(명지대학교)

12권 2호, 147~152쪽

초록

Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in “Software Engineering Economics” written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

Abstract

Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in “Software Engineering Economics” written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

발행기관:
대한안전경영과학회
분류:
안전공학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례 | 대한안전경영과학회지 2010 | AskLaw | 애스크로 AI