Just-in-time Scheduling with Multiple Competing Agents
Just-in-time Scheduling with Multiple Competing Agents
정대영(JDA 소프트웨어); 최병천(충남대학교)
37권 1호, 19~30쪽
초록
We consider a multi-agent scheduling problem such that each agent tries to maximize the weighted number of just-in-time jobs. Two objectives are considered : the first is to find the optimal solution for one agent with constraints on the other agents' weight functions, and the second is to find the largest set of efficient schedules of which corresponding objective vectors are different for the case with identical weights. We show that when the number of agents is fixed, the single machine case with the first objective is NP-hard in the ordinary sense, and present the polynomial-time algorithm for the two-machine flow shop case with the second objective and identical weights.
Abstract
We consider a multi-agent scheduling problem such that each agent tries to maximize the weighted number of just-in-time jobs. Two objectives are considered : the first is to find the optimal solution for one agent with constraints on the other agents' weight functions, and the second is to find the largest set of efficient schedules of which corresponding objective vectors are different for the case with identical weights. We show that when the number of agents is fixed, the single machine case with the first objective is NP-hard in the ordinary sense, and present the polynomial-time algorithm for the two-machine flow shop case with the second objective and identical weights.
- 발행기관:
- 한국경영과학회
- 분류:
- 경영학