애스크로AIPublic Preview
← 학술논문 검색
학술논문대한안전경영과학회지2013.03 발행KCI 피인용 1

식스시그마 프로젝트에서 연구가설과 통계가설에 의한 통계적 유의성 및 실무적 유의성의 적용방안

Implementation of Statistical Significance and Practical Significance Using Research Hypothesis and Statistical Hypothesis in the Six Sigma Projects

최성운(가천대학교)

15권 1호, 283~292쪽

초록

This paper aims to propose a new steps of hypothesis testing using analysis process and improvement process in the six sigma DMAIC. The six sigma implementation models proposed in this paper consist of six steps. The first step is to establish a research hypothesis by specification directionality and FBP(Falsibility By Popper). The second step is to translate the research hypothesis such as RHAT(Research Hypothesis Absent Type) and RHPT(Research Hypothesis Present Type) into statistical hypothesis such as (Null Hypothesis) and (Alternative Hypothesis). The third step is to implement statistical hypothesis testing by PBC(Proof By Contradiction) and proper sample size. The fourth step is to interpret the result of statistical hypothesis test. The fifth step is to establish the best conditions of product and process conditions by experimental optimization and interval estimation. The sixth step is to draw a conclusion by considering practical significance and statistical significance. Important for both quality practitioners and academicians, case analysis on six sigma projects with implementation guidelines are provided.

Abstract

This paper aims to propose a new steps of hypothesis testing using analysis process and improvement process in the six sigma DMAIC. The six sigma implementation models proposed in this paper consist of six steps. The first step is to establish a research hypothesis by specification directionality and FBP(Falsibility By Popper). The second step is to translate the research hypothesis such as RHAT(Research Hypothesis Absent Type) and RHPT(Research Hypothesis Present Type) into statistical hypothesis such as (Null Hypothesis) and (Alternative Hypothesis). The third step is to implement statistical hypothesis testing by PBC(Proof By Contradiction) and proper sample size. The fourth step is to interpret the result of statistical hypothesis test. The fifth step is to establish the best conditions of product and process conditions by experimental optimization and interval estimation. The sixth step is to draw a conclusion by considering practical significance and statistical significance. Important for both quality practitioners and academicians, case analysis on six sigma projects with implementation guidelines are provided.

발행기관:
대한안전경영과학회
DOI:
http://dx.doi.org/10.12812/ksms.2013.15.1.283
분류:
안전공학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
식스시그마 프로젝트에서 연구가설과 통계가설에 의한 통계적 유의성 및 실무적 유의성의 적용방안 | 대한안전경영과학회지 2013 | AskLaw | 애스크로 AI