불확실한 환경 하에서 중간 평가가 있는 시간-비용 프로젝트 문제

Project Time-Cost Tradeoff Problem with Milestones under an Uncertain Processing Time

최병천(충남대학교); 정지복(대전대학교)

38권 2호, 25~42쪽

초록

We consider a project time-cost tradeoff problem with two milestones, where one of the jobs has an uncertain processing time. Unless each milestone is completed on time, some penalty cost may be imposed. However, the penalty costs can be avoided by compressing the processing times of some jobs, which requires additional resources or costs. The objective is to minimize the expected total costs subject to the constraint on the expected project completion time. We show that the problem can be solved in polynomial time if the precedence graph of a project is a chain.

Abstract

We consider a project time-cost tradeoff problem with two milestones, where one of the jobs has an uncertain processing time. Unless each milestone is completed on time, some penalty cost may be imposed. However, the penalty costs can be avoided by compressing the processing times of some jobs, which requires additional resources or costs. The objective is to minimize the expected total costs subject to the constraint on the expected project completion time. We show that the problem can be solved in polynomial time if the precedence graph of a project is a chain.

발행기관:
한국경영과학회
DOI:
http://dx.doi.org/10.7737/JKORMS.2013.38.2.025
분류:
경영학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
불확실한 환경 하에서 중간 평가가 있는 시간-비용 프로젝트 문제 | 한국경영과학회지 2013 | AskLaw | 애스크로 AI