Case studies are made to investigate the relationship between the accuracy of energy production estimation and project feasibility indicators such as rate of return on equity (ROE) and debt service coverage ratio (DSCR) for three wind farm projects. It is found out that 1% improvement in the accuracy of energy production estimation may enhance the ROE by more than 0.5% in the case of P95, thanks to improved financing terms. AHP survey shows that MCP correlation of measured in situ wind data with long term wind speed distribution and hands-on experiences of flow analysis are more important than other factors for more precise annual energy production estimation.

Abstract

Case studies are made to investigate the relationship between the accuracy of energy production estimation and project feasibility indicators such as rate of return on equity (ROE) and debt service coverage ratio (DSCR) for three wind farm projects. It is found out that 1% improvement in the accuracy of energy production estimation may enhance the ROE by more than 0.5% in the case of P95, thanks to improved financing terms. AHP survey shows that MCP correlation of measured in situ wind data with long term wind speed distribution and hands-on experiences of flow analysis are more important than other factors for more precise annual energy production estimation.

발행기관:
한국경영과학회
DOI:
http://dx.doi.org/10.7737/KMSR.2013.30.2.001
분류:
경영학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
풍력발전사업 에너지생산량 산정 오차가 사업성지표에 미치는 영향 및 AHP를 이용한 중요인자 분석 | 경영과학 2013 | AskLaw | 애스크로 AI