납기를 고려한 아웃소싱 일정계획문제의정수계획을 활용한 접근법
Integer Programming Approach for the Outsourcing Decision Problem in a Single Machine Scheduling Problem with Due Date Constraints
홍정만(LG CNS Entrue 컨설팅사업부문); 이익선(동아대학교)
30권 2호, 133~141쪽
초록
In this paper, we considers the outsourcing decision problem in a single machine scheduling problem. The decision problem is to determine for each job whether to be processed on an in-house manufacturing or external facilities(outsourcing). Moreover, this paper considers a situation where each job has a due date. The objective of the problem is to minimize the outsourcing cost, subject to the due date constraints. The considered problem is proved to be NP-hard. Some solution properties and valid inequalities are derived, and an effective lower bound is derived based on the LP-relaxation. The results of experimental tests are presented to evaluate the performance of the suggested lower bound.
Abstract
In this paper, we considers the outsourcing decision problem in a single machine scheduling problem. The decision problem is to determine for each job whether to be processed on an in-house manufacturing or external facilities(outsourcing). Moreover, this paper considers a situation where each job has a due date. The objective of the problem is to minimize the outsourcing cost, subject to the due date constraints. The considered problem is proved to be NP-hard. Some solution properties and valid inequalities are derived, and an effective lower bound is derived based on the LP-relaxation. The results of experimental tests are presented to evaluate the performance of the suggested lower bound.
- 발행기관:
- 한국경영과학회
- 분류:
- 경영학