애스크로AIPublic Preview
← 학술논문 검색
학술논문대한안전경영과학회지2014.03 발행KCI 피인용 3

ABC 확장모형의 개발 및 적용

Development and Implementation of Extension Models for Activity-Based Costing

최성운(가천대학교)

16권 1호, 239~250쪽

초록

The purpose of this research is to implement and develop the Economic Cost Driver Size(ECDS) extended model to determine the optimal cash driver size with measurement complexity cost and allocation fail cost. ECDS model can be used to seek both measurement accuracy and time efficiency of the Activity-Base Costing (ABC). The study also develops Activity Priority Number (APN) to evaluate the importance of nonvalue-added activities improvement and to determine the representative cost driver of value-added activities when applying ECDS model. APN consists of Severity Priority Number (SPN), Undetectablitiy Priority Number (UPN) and Occurrence Priority Number (OPN). APN can be obtained from lower-stream activity, current activity, upper-stream activity in terms of hierarchical dependency of SIPOC (Supplier, Input, Process, Output, and Customer). In order to seek both efficiency of invested capital and reduction of overhead cost, the paper proposes the integrated ABC and Economic Value Added (EVA) model using redesigned ABC-based statement of comprehensive income and EVA-based statement of financial position. For a better understanding of the proposed ABC-EVA integrated model, numerical examples are demonstrated in this paper. Cost drivers of ABC and capital drivers of EVA in the proposed model can be used to reduce activity overhead cost from ABC-based statement of comprehensive income and to lessen activity capital charge from EVA-based statement of financial position.

Abstract

The purpose of this research is to implement and develop the Economic Cost Driver Size(ECDS) extended model to determine the optimal cash driver size with measurement complexity cost and allocation fail cost. ECDS model can be used to seek both measurement accuracy and time efficiency of the Activity-Base Costing (ABC). The study also develops Activity Priority Number (APN) to evaluate the importance of nonvalue-added activities improvement and to determine the representative cost driver of value-added activities when applying ECDS model. APN consists of Severity Priority Number (SPN), Undetectablitiy Priority Number (UPN) and Occurrence Priority Number (OPN). APN can be obtained from lower-stream activity, current activity, upper-stream activity in terms of hierarchical dependency of SIPOC (Supplier, Input, Process, Output, and Customer). In order to seek both efficiency of invested capital and reduction of overhead cost, the paper proposes the integrated ABC and Economic Value Added (EVA) model using redesigned ABC-based statement of comprehensive income and EVA-based statement of financial position. For a better understanding of the proposed ABC-EVA integrated model, numerical examples are demonstrated in this paper. Cost drivers of ABC and capital drivers of EVA in the proposed model can be used to reduce activity overhead cost from ABC-based statement of comprehensive income and to lessen activity capital charge from EVA-based statement of financial position.

발행기관:
대한안전경영과학회
DOI:
http://dx.doi.org/10.12812/ksms.2014.16.1.239
분류:
안전공학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
ABC 확장모형의 개발 및 적용 | 대한안전경영과학회지 2014 | AskLaw | 애스크로 AI