애스크로AIPublic Preview
← 학술논문 검색
학술논문한국경영과학회지2016.02 발행KCI 피인용 4

기대 평균흐름시간 최소화를 위한 단일설비 일정계획의 성능변동 분석

Chaotic Behavior of a Single Machine Scheduling Problem with an Expected Mean Flow Time Measure

주운기(선문대학교)

41권 1호, 87~98쪽

초록

A single machine scheduling problem for jobs with stochastic processing time is considered in this study. Shortest processing time (SPT) sequencing according to the expected processing times of jobs is optimal for schedules with minimal expected mean flow time when all the jobs arrive to be scheduled and their expected processing times are known. However, SPT sequencing according to the expected processing time may not be optimal for the minimization of the mean flow time when the actual processing times of jobs are known. This study evaluates the complexity of SPT sequencing through a comparison of the mean flow times of schedules based on the expected processing times and actual processing times of randomly generated jobs. Evaluation results show that SPT sequencing according to the expected flow time exhibits chaotic variation to the optimal mean flow time. The relative deviation from the optimal mean flow time increases as the number of jobs, processing time, or coefficient of variation increases.

Abstract

A single machine scheduling problem for jobs with stochastic processing time is considered in this study. Shortest processing time (SPT) sequencing according to the expected processing times of jobs is optimal for schedules with minimal expected mean flow time when all the jobs arrive to be scheduled and their expected processing times are known. However, SPT sequencing according to the expected processing time may not be optimal for the minimization of the mean flow time when the actual processing times of jobs are known. This study evaluates the complexity of SPT sequencing through a comparison of the mean flow times of schedules based on the expected processing times and actual processing times of randomly generated jobs. Evaluation results show that SPT sequencing according to the expected flow time exhibits chaotic variation to the optimal mean flow time. The relative deviation from the optimal mean flow time increases as the number of jobs, processing time, or coefficient of variation increases.

발행기관:
한국경영과학회
DOI:
http://dx.doi.org/10.7737/JKORMS.2016.41.1.087
분류:
경영학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
기대 평균흐름시간 최소화를 위한 단일설비 일정계획의 성능변동 분석 | 한국경영과학회지 2016 | AskLaw | 애스크로 AI