전력수요관리투자사업의 M&V를 위한 성과산정 옵션에 대한 연구
A Study on Performance Calculation Option for M&V of Power Demand Management Investment Project
조성환(전주대학교)
20권 5호, 697~701쪽
초록
In this study, we have defined measurement and verification methods and procedures to assess the energy use on the utility system of building. Time series data conversion methods and algorithms have been proposed in performance evaluation options. To verify the feasibility of the method, the energy consumption of the refrigerator, which was an energy utility , was measured and analyzed. we present an algorithm based on the annual base conversion and analyze it based on actual data. As a result, a k-means clustering moving average method was defined for the performance calculation option A, and the use time correction coefficient method was proposed. The validity of this method was verified through the verification.
Abstract
In this study, we have defined measurement and verification methods and procedures to assess the energy use on the utility system of building. Time series data conversion methods and algorithms have been proposed in performance evaluation options. To verify the feasibility of the method, the energy consumption of the refrigerator, which was an energy utility , was measured and analyzed. we present an algorithm based on the annual base conversion and analyze it based on actual data. As a result, a k-means clustering moving average method was defined for the performance calculation option A, and the use time correction coefficient method was proposed. The validity of this method was verified through the verification.
- 발행기관:
- 한국기계항공기술학회
- 분류:
- 기계공학