두 단계 흐름생산라인에서 가중완료시간을 최소화하기 위해 아웃소싱 전략을 활용하는 일정계획문제
Scheduling Problem with Outsourcing Strategy to Minimize the Weighted Completion Time in a Two-machine Flowshop
이익선(동아대학교)
39권 1호, 29~39쪽
초록
This paper researches a two-machine flowshop scheduling with an outsourcing strategy. In the flowshop, the first processing of jobs is either managed in-house or outsourced to outside suppliers, the second processing is processed in-house only. When a job is outsourced, the company pays outsourcing cost for each job, and considers outsourcing lead-time implying that the second processing can start after the lead-time. The objective cost function of this paper is the sum of the total weighted completion time and the outsourcing costs. This paper derives a branch-and-bound algorithm and some heuristics for the problem. From the computational experiments, we can observe that the performance of the derived algorithms is effective and efficient.
Abstract
This paper researches a two-machine flowshop scheduling with an outsourcing strategy. In the flowshop, the first processing of jobs is either managed in-house or outsourced to outside suppliers, the second processing is processed in-house only. When a job is outsourced, the company pays outsourcing cost for each job, and considers outsourcing lead-time implying that the second processing can start after the lead-time. The objective cost function of this paper is the sum of the total weighted completion time and the outsourcing costs. This paper derives a branch-and-bound algorithm and some heuristics for the problem. From the computational experiments, we can observe that the performance of the derived algorithms is effective and efficient.
- 발행기관:
- 한국경영과학회
- 분류:
- 경영학