애스크로AIPublic Preview
← 학술논문 검색
학술논문경영과학2022.03 발행KCI 피인용 3

두 단계 흐름생산라인에서 가중완료시간을 최소화하기 위해 아웃소싱 전략을 활용하는 일정계획문제

Scheduling Problem with Outsourcing Strategy to Minimize the Weighted Completion Time in a Two-machine Flowshop

이익선(동아대학교)

39권 1호, 29~39쪽

초록

This paper researches a two-machine flowshop scheduling with an outsourcing strategy. In the flowshop, the first processing of jobs is either managed in-house or outsourced to outside suppliers, the second processing is processed in-house only. When a job is outsourced, the company pays outsourcing cost for each job, and considers outsourcing lead-time implying that the second processing can start after the lead-time. The objective cost function of this paper is the sum of the total weighted completion time and the outsourcing costs. This paper derives a branch-and-bound algorithm and some heuristics for the problem. From the computational experiments, we can observe that the performance of the derived algorithms is effective and efficient.

Abstract

This paper researches a two-machine flowshop scheduling with an outsourcing strategy. In the flowshop, the first processing of jobs is either managed in-house or outsourced to outside suppliers, the second processing is processed in-house only. When a job is outsourced, the company pays outsourcing cost for each job, and considers outsourcing lead-time implying that the second processing can start after the lead-time. The objective cost function of this paper is the sum of the total weighted completion time and the outsourcing costs. This paper derives a branch-and-bound algorithm and some heuristics for the problem. From the computational experiments, we can observe that the performance of the derived algorithms is effective and efficient.

발행기관:
한국경영과학회
DOI:
http://dx.doi.org/10.7737/KMSR.2022.39.1.029
분류:
경영학

AI 법률 상담

이 논문의 주제에 대해 더 알고 싶으신가요?

460만+ 법률 자료에서 관련 판례·법령·해석례를 찾아 답변합니다

AI 상담 시작
두 단계 흐름생산라인에서 가중완료시간을 최소화하기 위해 아웃소싱 전략을 활용하는 일정계획문제 | 경영과학 2022 | AskLaw | 애스크로 AI