군수품 정부품질보증 위험성 평가제도 개선을 위한 제언
Proposal for Government Quality Assurance Risk Assessment System for Military Supplies
안남수(육군사관학교)
51권 2호, 155~170쪽
초록
Purpose: Nowadays, the risk assessment system is widely used in many industrial and public areas to reduce the possible risks. The system is used to determine the priorities of the government quality assurance works in Defense Agency for Technology and Quality. However, as the risk assessment system is used for other purposes, there are some items that need improvement, and in this study, we propose improvement plans by benchmarking the risk assessment systems of other institutions. Methods: In this paper, first, the procedures of risk assessment system used in many industrial sites were reviewed, and how each institution specialized and applied the system. Afterwards, by benchmarking various risk assessment systems, an improvement plan on how to operate the risk assessment system in the case of government quality assurance for centrally procured military supplies was presented, and practical application cases were presented to prove the usefulness of the improvement plan. Results: The proposed risk assessment system differs from the existing system in five major aspects. First, inputs, outputs, and key performance indicators were specified from the systematic point of view. Second, risk analysis was analyzed in four dimensions: probability of occurrence, impact, detection difficulty. Third, risk mitigation measures were classified, control, transfer, and sharing. Fourth, the risk mitigation measures were realized through document verification, product verification, process verification, and quality system evaluation. Finally, risk mitigation measures were implemented and the effectiveness of the risk mitigation measures was evaluated through effectiveness evaluation. Conclusions: In order for the risk assessment procedure proposed in this study to be applied to actual work, it is necessary to obtain the consent of the person involved in the work due to the increased time for risk identification and preparation of the government quality assurance log, and a change in the information system that performs the actual work is required. Therefore, the authors of this study plan to actively perform internal seminar presentations and work improvement suggestions to apply these research outputs to actual work.
Abstract
Purpose: Nowadays, the risk assessment system is widely used in many industrial and public areas to reduce the possible risks. The system is used to determine the priorities of the government quality assurance works in Defense Agency for Technology and Quality. However, as the risk assessment system is used for other purposes, there are some items that need improvement, and in this study, we propose improvement plans by benchmarking the risk assessment systems of other institutions. Methods: In this paper, first, the procedures of risk assessment system used in many industrial sites were reviewed, and how each institution specialized and applied the system. Afterwards, by benchmarking various risk assessment systems, an improvement plan on how to operate the risk assessment system in the case of government quality assurance for centrally procured military supplies was presented, and practical application cases were presented to prove the usefulness of the improvement plan. Results: The proposed risk assessment system differs from the existing system in five major aspects. First, inputs, outputs, and key performance indicators were specified from the systematic point of view. Second, risk analysis was analyzed in four dimensions: probability of occurrence, impact, detection difficulty. Third, risk mitigation measures were classified, control, transfer, and sharing. Fourth, the risk mitigation measures were realized through document verification, product verification, process verification, and quality system evaluation. Finally, risk mitigation measures were implemented and the effectiveness of the risk mitigation measures was evaluated through effectiveness evaluation. Conclusions: In order for the risk assessment procedure proposed in this study to be applied to actual work, it is necessary to obtain the consent of the person involved in the work due to the increased time for risk identification and preparation of the government quality assurance log, and a change in the information system that performs the actual work is required. Therefore, the authors of this study plan to actively perform internal seminar presentations and work improvement suggestions to apply these research outputs to actual work.
- 발행기관:
- 한국품질경영학회
- 분류:
- 학제간연구